Criticism of the waterfall model
The waterfall model however is argued by many to be a bad idea in practice, mainly because of their belief that it is impossible to get one phase of a software product's lifecycle "perfected" before moving on to the next phases and learning from them (or, at least, the belief that this is impossible for any non-trivial program). For example, clients may not be aware of exactly what requirements they want before they see a working prototype and can comment upon it; they may change their requirements constantly, and program designers and implementers may have little control over this. If clients change their requirements after a design is finished, that design must be modified to accommodate the new requirements, invalidating quite a good deal of effort if overly large amounts of time have been invested into "Big Design Up Front". (Thus, methods opposed to the naive waterfall model--such as those used in Agile software development--advocate less reliance on a fixed, static requirements document or design document). Designers may not (or, more likely, cannot) be aware of future implementation difficulties when writing a design for an unimplemented software product. That is, it may become clear in the implementation phase that a particular area of program functionality is extraordinarily difficult to implement. If this is the case, it is better to revise the design than to persist in using a design that was made based on faulty predictions and that does not account for the newly discovered problem areas.
Steve McConnell in Code Complete (a book which criticizes the widespread use of the waterfall model) refers to design as a "wicked problem" - a problem whose requirements and limitations cannot be entirely known before completion. The implication is that it is impossible to get one phase of software development "perfected" before time is spent in "reconnaissance" working out exactly where and what the big problems are.
To quote from David Parnas' "a rational design process: how and why to fake it (PDF)":
“Many of the [system's] details only become known to us as we progress in the [system's] implementation. Some of the things that we learn invalidate our design and we must backtrack.”
The idea behind the waterfall model may be "measure twice; cut once", and those opposed to the waterfall model argue that this idea tends to fall apart when the problem being measured is constantly changing due to requirement modifications and new realizations about the problem itself. The idea behind those who object to the waterfall model may be "time spent in reconnaissance is seldom wasted".
In summary, the criticisms of a non-iterative development approach (such as the waterfall model) are as follows:
- Many software projects must be open to change due to external factors; the majority of software is written as part of a contract with a client, and clients are notorious for changing their stated requirements. Thus the software project must be adaptable, and spending considerable effort in design and implementation based on the idea that requirements will never change is neither adaptable nor realistic in these cases.
- Unless those who specify requirements and those who design the software system in question are highly competent, it is difficult to know exactly what is needed in each phase of the software process before some time is spent in the phase "following" it. That is, feedback from following phases is needed to complete "preceding" phases satisfactorily. For example, the design phase may need feedback from the implementation phase to identify problem design areas. The counter-argument for the waterfall model is that experienced designers may have worked on similar systems before, and so may be able to accurately predict problem areas without time spent prototyping and implementing.
- Constant testing from the design, implementation and verification phases is required to validate the phases preceding them. Constant "prototype design" work is needed to ensure that requirements are non-contradictory and possible to fulfill; constant implementation is needed to find problem areas and inform the design process; constant integration and verification of the implemented code is necessary to ensure that implementation remains on track. The counter-argument for the waterfall model here is that constant implementation and testing to validate the design and requirements is only needed if the introduction of bugs is likely to be a problem. Users of the waterfall model may argue that if designers (et cetera) follow a disciplined process and do not make mistakes that there is no need for constant work in subsequent phases to validate the preceding phases.
- Frequent incremental builds (following the "release early, release often" philosophy) are often needed to build confidence for a software production team and their client.
- It is difficult to estimate time and cost for each phase of the development process without doing some "recon" work in that phase, unless those estimating time and cost are highly experienced with the type of software product in question.
- The waterfall model brings no formal means of exercising management control over a project and planning control and risk management are not covered within the model itself.
- Only a certain number of team members will be qualified for each phase; thus to have "code monkeys" who are only useful for implementation work do nothing while designers "perfect" the design is a waste of resources. A counter-argument to this is that "multiskilled" software engineers should be hired over "specialized" staff.
RAD
http://en.wikipedia.org/wiki/Rapid_application_development
Pros and Cons of RAD
Pros
- Increased speed of development through methods including rapid prototyping, virtualization of system related routines, the use of CASE tools, and other techniques.
- Decreased end-user functionality (arising from narrower design focus), hence reduced complexity
- Larger emphasis on simplicity and usability of GUI design
Cons
- Reduced Scalability, and reduced features when a RAD developed application starts as a prototype and evolves into a finished application
- Reduced features occur due to time boxing when features are pushed to later versions in order to finish a release in a short amount of time [citation needed]